Progress
100%
Done
25
of 25 tasks
In Progress
0
Remaining
0
Gates
3/4
passed
Sales → Design Handoff
• Scope calculator completed
Design → Production Handoff
All 2 requirements met
Production → Installation
All 2 requirements met
Installation → Completion
All 2 requirements met
Initial client meeting / site visit | Amelia | 2026-01-16 | Done | |
Complete scope calculator | Amelia | 2026-01-19 | Done | |
Prepare concept proposal | Amelia | 2026-01-21 | Done | |
Send quotation to client | Amelia | 2026-01-22 | Done | |
Follow up on quotation | Amelia | 2026-01-27 | Done | |
Collect deposit | Amelia | 2026-01-28 | Done | |
Create project folder + setup | Amelia | 2026-01-29 | Done | |
GATE: Sales → Design HandoffBlocked: Scope calculator completed | ||||
Design kickoff meeting | Unassigned | 2026-01-16 | Done | |
Site measurement / reference check | Unassigned | 2026-01-20 | Done | |
Concept design (layout + modules) | Unassigned | 2026-01-23 | Done | |
CEO design review | Jon | 2026-01-26 | Done | |
Client design presentation + revisions | Unassigned | 2026-02-02 | Done | |
Final design approval from client | Unassigned | 2026-02-04 | Done | |
Production drawing package (BOM + cut lists) | Unassigned | 2026-02-09 | Done | |
GATE: Design → Production Handoff | ||||
Production planning meeting | Ah Bawi | 2026-01-16 | Done | |
Material procurement + CNC programming | Ah Bawi | 2026-01-23 | Done | |
CNC cutting | Ah Bawi | 2026-01-28 | Done | |
Processing + finishing | Ah Bawi | 2026-02-04 | Done | |
Quality check + packaging | Ah Bawi | 2026-02-06 | Done | |
Mark as Install Ready | Ah Bawi | 2026-02-09 | Done | |
GATE: Production → Installation | ||||
Schedule installation with client | Amelia | 2026-01-19 | Done | |
Delivery to site | Ah Bawi | 2026-01-20 | Done | |
On-site installation | Ah Bawi | 2026-01-23 | Done | |
Client walkthrough + sign-off | Amelia | 2026-01-26 | Done | |
Completion photos + portfolio | Amelia | 2026-01-27 | Done | |
GATE: Installation → Completion | ||||