Installation scheduling & logistics
Plan and track installations. Calendar view shows all scheduled installs — drag and drop to reschedule. Green chips = production complete and ready to install. Red = overdue. Check the readiness section at the bottom before each install week.
March 2026
Pre-install checklist: Before each install, verify: (1) Production stage is "Install Ready", (2) Building access is confirmed with client, (3) Allowed install times are noted, (4) Address and contact details are correct. If a project isn't ready, reschedule by dragging it on the calendar.
Install Readiness — Next 14 Days
Green chip on calendar = Install Ready. Safe to proceed with install.
Red chip = overdue. Either reschedule or expedite production.
Blue chip = scheduled but production not yet complete. Monitor Production Queue.